South Main/Greenhill Intersection Improvements
Southern Leg of Greenhill/S. Main Roundabout
Starting Wednesday, July 5th, the City’s contractor, PCI, will be continuing with construction at the South Main Street and Greenhill Roundabout with removals of temporary pavement and replacement of permanent pavement. In order for the contractor to start work, temporary pavement panels will be removed, and the southbound travel lane of the roundabout will be restricted in width during this removal and replacement operation. Short-term closures of this direction in the roundabout may also take place as workers repave this quadrant. Attached is a map of the impacted travel lane.
The restricted width is anticipated to be lifted by Monday, July 10th to vehicular traffic. After Monday, July 10th, crews will continue with other curb, truck apron, and landscaping items in the central part of the roundabout.
At the same time, the contractor will be shifting Greenhill traffic into the middle lanes to complete the NE corner trail/retaining wall and fence and SW corner sidewalk and fence. Once the work along the outside of the roundabout is completed, the traffic pattern with switch to the outside lanes of Greenhill, and the contractor will finish the remaining work inside the roundabout.
Below is a map of the closure area and the planned detour.
Beginning Wednesday, November 23rd, 2022, the contractor will be modifying the traffic pattern at the intersection of Greenhill Road and South Main Street. The traffic pattern will begin utilization of the paved roundabout for southbound S. Main Street traffic and both east- and west-bound Greenhill Road traffic. This change is not anticipated to impact traffic operations during the switch.
The intent of this traffic pattern is to allow the contractor to finish the splitter island curb line on either side of the intersection by closing the inside lanes of Greenhill for room. The temporary 4-way stop at the intersection of Greenhill, Estate, and Coneflower will still be in effect.
Below is a photo of the expected traffic pattern
If you want to receive road closure notices by e-mail and/or text message, visit www.cedarfalls.com/notify and follow the instructions for road construction as shown. If you have any questions or concerns during the course of construction you may contact Benjamin Claypool by phone: (319) 243-2704, fax: (319) 268-5197, or e-mail: Benjamin.claypool@cedarfalls.com.
Beginning on or after Wednesday, August 3rd, 2022, the contractor will begin Stage 3 reconstruction of the Greenhill Road and S. Main Street intersection. In order for the contractor to begin pavement removal, a full road closure of S. Main Street from Greenhill Road to Bluebell Road will be required. The road closure will be in effect while the contractor works on pavement removal, storm sewer, water main, and new pavement on the southern half of S. Main Street & Greenhill Road. The intersection will be a three-way stop controlled intersection, and S. Main Street traffic will be advised to detour using Coneflower Parkway and Bluebell Road. Attached you will find a map with the closure area highlighted.
For safety's sake, please stay away from the construction area. Heavy equipment will be moving back and forth on the closed street. It would be advisable to stay behind the sidewalk on the property side during the reconstruction work.
If you want to receive road closure notices by e-mail and/or text message, visit www.cedarfalls.com/notify and follow the instructions for road construction as shown. If you have any questions or concerns during the course of construction you may contact Benjamin Claypool by phone: (319) 243-2704, fax: (319) 268-5197, or e-mail: Benjamin.claypool@cedarfalls.com.
Beginning the week of Monday, March 28th, 2022, the contractor will begin Stage 1 reconstruction of the Greenhill Road and S. Main Street intersection. In order for the contractor to begin pavement removal, southbound S. Main Street lane closure will be required. The lane closure will be in effect while the contractor works on pavement removal, storm sewer, and new pavement on the northwest and northeast corner of S. Main & Greenhill. The intersection will be converted to a temporary all-way stop controlled intersection, and southbound S. Main Street traffic will be advised to detour using Highway 27/58 from University Avenue to Greenhill Road. Below you will find a map with the closure area highlighted.
For safety's sake, please stay away from the construction area. Heavy equipment will be moving back and forth on the closed street. It would be advisable to stay behind the sidewalk on the property side during the reconstruction work.
If you want to receive road closure notices by e-mail or text message, visit www.cedarfalls.com/notify and follow the instructions for road construction as shown. If you have any questions or concerns during the course of construction you may contact Benjamin Claypool by phone: (319) 243-2704, fax: (319) 268-5197, or e-mail: Benjamin.claypool@cedarfalls.com
PUBLIC INFORMATION MEETING NOTICE
Greenhill Road/South Main Street Reconstruction
City Project No. RC-173-3228
The City of Cedar Falls Public Works Department has contracted Shive-Hattery Engineers & Architects to provide design services for the above-named project. The intersection will be replaced in its entirety with a new roundabout.
With the project nearing final design, the City and Shive-Hattery will be holding an in-person public information meeting at the location, time, and date listed below.
Location: Public Safety Building (4600 S Main Street, Cedar Falls)
Time: 5:30 – 7:00 PM
Date: Thursday, May 6th, 2021
Upon arrival, you will enter the Public Safety building on the south side (opposite from the fire truck garage doors). As a requirement for the Public Safety Building during the ongoing COVID-19 pandemic, masks must be worn inside. Once inside, you will take an immediate right turn to enter the conference room where City and consulting staff will have a short video on the current state of the design and be able to address any questions or concerns in a one-on-one basis.
If you are unable to attend the meeting, but have any additional questions, we strongly recommend checking out the project website: https://www.shive-hattery.com/microsite/city-cedar-falls. At this website you will find:
Purpose of the Project
- The Design Team
- Current Schedule for design and construction
- Layout of the intersection
- Information on Roundabouts
- Feedback section that will send comments and questions directly to the project design team.
If you have any questions or concerns regarding this work, please contact:
DAVID WICKE, P.E.
Principal Engineer
City of Cedar Falls
Public Works | Engineering Division
220 Clay Street | Cedar Falls, Iowa 50613
D: 319.268.5162 | F: 319.268.5197
Email: David.Wicke@CedarFalls.com
South Main/Greenhill Road Intersection Improvements
The City of Cedar Falls Public Works Department has contracted Shive-Hattery Engineers & Architects to provide design services for the above-named project. The intersection will be replaced in its entirety with a new roundabout.
Due to COVID-19, Shive-Hattery will be conducting our public outreach virtually. This means we will not be using our typical process, however we want to share the current status of the project and the progress of the project.
Shive-Hattery has developed a website (below) which will have the latest information on the design, and will include City and public comments:
https://www.shive-hattery.com/microsite/city-cedar-falls.
At this website you will find:
- Purpose of the Project
- The Design Team
- Current Schedule for design and construction
- Conceptual Layout of the intersection
- Information on Roundabouts
- Feedback section that will send comments and questions directly to the project design team.
If you have any questions or concerns regarding this work, please contact:
JONATHAN P. FITCH, P.E.
Principal Engineer
City of Cedar Falls
Public Works | Engineering Division
220 Clay Street | Cedar Falls, Iowa 50613
D: 319.268.5165 | F: 319.268.5197
Email: jon.fitch@cedarfalls.com