2022 Street Construction
The 2022 construction season will involve portions of six (6) city streets totaling 1.28 miles.
Work will include 7110 SY of pavement removal and replacement, 4156 tons of asphalt overlay, 135 LF of new concrete curb, subgrade preparation, 2219 LF of storm sewer, 27 new storm sewer intakes, 2548 LF of water main replacement, water main services, 1623 LF of new subdrain, replacement of driveway approaches and pedestrian ramps, modifications to existing storm sewer intakes, and replacement of signage and striping.
As a part of the 2022 Street Construction Project, the following streets have been scheduled for construction during the 2022 construction season:
Street | From | To | Type |
---|
Olive Street | W. 4th Street | W. 6th Street | Reconstruction |
W. 18th Street | Campus Street | College Street | Reconstruction |
Elmwood Ave. | Rainbow Drive | Waterloo Road | Restoration |
Hudson Road | W. 1st Street | W. 12th Street | Restoration |
Pin Oak Drive | Waterloo Road | Victory Drive | Restoration |
Iowa Street | W. 1st Street | W. 2nd Street | Water Main Replacement |