News Flash

Our City News

Posted on: June 15, 2023

Road Closure Notice: Main Street from 21st to 22nd

Beginning Monday, June 19, 2023, the contractor will begin the reconstruction of Main Street from the current construction limits at 21st Street to the north side of the intersection of 22nd Street. In order for the contractor to begin pavement removal, a full road closure will be required. The road closure will be in effect for approximately twelve (12) weeks, depending on the weather. Below you will find a map with the closure area highlighted. Residential access will be maintained for the homes on the west side of Main Street.


Main Street Closure Map


The planned work for this street includes the removal of the existing pavement, and driveway approaches, installation of new sanitary sewer, water main and storm sewer, new concrete pavement and driveway approaches, and grass from the back of the new curb to the front edge of the sidewalk. Any landscaping, including plants and decorations located between the curb and the existing sidewalk are subject for removal by the contractor. If you intend to keep any of these materials, relocations outside of the right-of-way must take place ahead of the contractor to ensure they stay with the property.

For safety's sake, please stay away from the construction area. Heavy equipment will be moving back and forth on the closed street. It would be advisable to stay behind the sidewalk on the property side during the reconstruction work.

During the closure, alternate City garbage pickup points will be required for residents who normally place automated collection carts within the closure area of Main Street. Residents can place their collection carts on the nearest adjacent side streets or along their rear yard alley (if applicable) as shown with the yellow boxes on the attached map. This should be done on the normal collection day for that particular street.

Yard waste collection carts can be placed curbside at the same location as the garbage collection carts for pickup. Yard waste may also be taken to the transfer station in any type of container when the transfer station is open.

For your convenience, we have included labels to be placed on the back of the collection carts (for those with City collection carts) for your use. Residents should have their carts out by 7:00 a.m. on the day of collection and brought in by 8:00 p.m. on the day of collection.

If your mailbox is affixed to your home, mail delivery will not be impacted.

If you want additional information about the Main Street Construction Project, please visit the project web page at www.cedarfallsmainstreetproject.com. To receive road closure notices by e-mail, visit www.cedarfalls.com/notify and follow the instructions for road construction as shown.

For any questions on the project, please contact Ben Claypool at (319) 24302704 or benjamin.claypool@cedarfalls.com.  

A reminder that during construction, the Cedar Falls Downtown District remains open. Learn more about everything the district has to offer and stay updated on their events at www.communitymainstreet.org/!

Facebook Twitter Email

Other News in Our City News

Career Fair 2024 text on gray background

City of Cedar Falls To Host Career Fair

Posted on: February 28, 2024
public parking meeting text

Cedar Falls to Host Public Meetings for Downtown Parking

Posted on: February 8, 2024 | Last Modified on: May 16, 2023
Parking survey quick read code

Cedar Falls Downtown Parking Survey

Posted on: February 19, 2024 | Last Modified on: May 16, 2023
picture of a bulldozer

Traffic Signal Work - Ridgeway Avenue

Posted on: February 25, 2024 | Last Modified on: May 16, 2023

Road Closure Notice: Rownd Street

Posted on: February 24, 2024
Public Meeting FB 2020

Public Information Meeting: 2024 Street Restoration and Alley Reconstruction Project

Posted on: February 22, 2024 | Last Modified on: May 16, 2023
Acting Chief Mark Howard sitting with citizens during coffee with a cop

Coffee With a Cop Events

Posted on: February 1, 2024

Sidewalk Scaffolding - East 4th Street

Posted on: January 22, 2024
CF Press Release

Winter Safety Reminders

Posted on: January 8, 2024

Trail Closure - South Riverside Trail

Posted on: December 27, 2023
overhead shot of the cedar river

Cedar River Recreational Project Update

Posted on: December 21, 2023
TC panther mascot with a family

Panthers on Parade

Posted on: August 29, 2023
Kids sitting in a row with firefighters

Cedar Falls Hosts Youth Fire Academy

Posted on: August 2, 2023
Fireworks allowed from 9 AM to 10 AM on July 3 and From 9 AM to 11 AM on July 4 (text)

Cedar Falls Fireworks Ordinance

Posted on: June 2, 2023
construction updates graphic

27th Street Reconstruction Phase II

Posted on: September 15, 2022